Summary of Decision and Reasons: George Mikhael, P.Eng.

In the matter of a hearing under the Professional Engineers Act, R.S.O. 1990, c. P.28, of a complaint regarding the conduct of GEORGE MIKHAEL, P.ENG., a member of the Association of Professional Engineers of Ontario.

The panel of the Discipline Committee met to hear this matter on January 12, 2016 at the Association of Professional Engineers of Ontario in Toronto.

THE ALLEGATIONS

This case arose from a complaint filed by Albert Bastien concerning a solar panel system installed on the roof of his house. The Statement of Allegations dated April 24, 2015 against George Mikhael, P.Eng. (the member), alleged that he was guilty of professional misconduct.

AGREED STATEMENT OF FACTS

Counsel for the association advised the panel that agreement had been reached on the facts and introduced an Agreed Statement of Facts summarized as follows:

In 2011, the complainant, Albert Bastien, retained Powerserve/Neighbourhood Electric Company (Neighbourhood Electric) to install a solar panel system on the roof of his residence located in Amherstburg, Ontario. Neighbourhood Electric applied for a building permit from the Town of Amherstburg on April 1, 2011 for the project.

Bastien and/or Neighbourhood Electric retained the member to analyze the impact of the solar panel system on the structural integrity of the roof. There was no written contract between the member in respect to the scope of his retainer.

As part of the permit application, the member prepared a letter of conformance for Bastien dated March 25, 2011 addressed “to whom it may concern.” He described his analysis of the existing roof trusses to sustain an additional load of the solar panel system. The member stated that, “The existing structure will sustain the additional load of 5 pounds per square foot (PSF), imposed from the solar system.”

This letter was signed, dated and sealed by the member.

On March 30, 2011, the member revised his March 25, 2011 letter as follows:

“I certify that the anchors have the required strength to withstand any uplift caused by the wind.”

The March 30, 2011 letter was signed and sealed by the member. The member also dated, signed and sealed a construction drawing bearing the title block of Mitek, as supplier of roof trusses.

On or about March 31, 2011, the town issued a building permit for the installation of a solar panel system at Bastien’s home. The permit was issued to Bastien.

Neighbourhood Electric installed the solar panel system. The member was not involved with the installation of the solar panel system.

During the installation, Bastien was concerned about the security of the framing on the roof. As a result, Neighbourhood Electric added numerous additional anchors that attached the frame to the roof.

After installation, at Bastien’s request, Neighbourhood Electric inspected and photographed his attic area to confirm that the anchorage points were sufficient and properly installed. Neighbourhood Electric noted that one anchorage in the garage was protruding through the side of the roof truss. Neighbourhood Electric offered to fix it, but Bastien declined.

On October 25, 2011, the building department of the town requested a General Review Certificate or Letter of Conformance from the design engineer in accordance with Division C, section 1.2 and division A, section 1.3.1.1 of the Ontario Building Code. The building department required confirmation that the member had inspected and reviewed the site installation and that the installation was compliant with his design.

The member reviewed information forwarded to him by Neighbourhood Electric, which consisted of: installation specifications, anchor drawings (showing location and number), and photographs of Neighbourhood Electric’s inspection of Bastien’s attic. He did not physically attend Bastien’s home or inspect the solar panel system.

On October 26, 2011, the member prepared a Letter of Conformance, to Bastien’s attention, in which he stated that he had reviewed the solar system installation. The member stated that “after reviewing the installation of the solar panels on your roof” and the technical data, he confirmed that the solar system was installed according to the manufacturing recommendations, and with two bolts where only one bolt was required. The member gave the structure a safety factor of 3, and stated that there “will be no danger that the rack solar system will be blown in the future.” He confirmed that the installation was acceptable and “structurally safe, sound and capable to sustain the wind loads.”

The association obtained an independent engineer’s report dated January 30, 2015. The independent engineer’s report concluded that:

(a)    The member failed to comply with the Ontario Building Code in his review and analysis of the trusses as set out in his March 25, 2011 and March 30, 2011 letters. He did not consider the possible load conditions or the actual load conditions, nor did he apply the design requirements of the Ontario Building Code, including the assessment of the dead loads, snow loads, downward wind loading, and concentrated loads, or any loading caused by wind uplift. The loads imposed on the trusses are in excess of their original design load. As a result, his opinion set out in his March 25, 2011 and March 30, 2011 letters was incomplete, inaccurate and not in compliance with sections 4.1.5.1 and 4.1.5.9 of the Ontario Building Code. In the circumstances, he failed to maintain the minimum standards that a reasonable and prudent practitioner would maintain in the circumstances; and

(b)    The member failed to comply with the Ontario Building Code in his review and analysis of the trusses as set out in his October 26, 2011 Letter of Conformance. He did not consider the possible load conditions or the actual load conditions, nor did he apply the design requirements of the Ontario Building Code, including the assessment of the dead loads, snow loads, downward wind loading, and concentrated loads, or any loading caused by wind uplift. The member also failed to properly consider the installation variances to assess the anchor capacity. He provided his opinion that there would be no danger of the solar rack being “blown in the future” without adequate information to come to such a conclusion. As a result, his opinion set out in this October 26, 2011 Letter of Conformance was incomplete, inaccurate and not in compliance with the Ontario Building Code. In the circumstances, he failed to maintain the minimum standards that a reasonable and prudent practitioner would maintain in the circumstances.

The member admitted that the work carried out by him, as set out in the Agreed Statement of Facts, was deficient, and fell below the expected standard of practice for engineering work of this type, and that he failed to comply with the applicable standards and codes, as set out in the independent engineer’s report.

PLEA BY MEMBER

The member admitted to the allegations as set out in the Agreed Statement of Facts. The panel conducted a plea inquiry and was satisfied that the member’s admission was voluntary, informed and unequivocal.

DECISION

The panel considered the Agreed Statement of Facts and finds that the facts support a finding of professional misconduct and found that George Mikhael, P.Eng., committed an act of professional misconduct.

JOINT SUBMISSION ON PENALTY

Counsel for the association advised the panel that a Joint Submission as to Penalty had been agreed upon. The association put forward that the penalty would:

(a)    provide sufficient protection to the public by ensuring that the member had the necessary technical knowledge to undertake structural engineering, noting that the member is a sole practitioner and failure to pass the required exams would mean that he would be unable to practise for 10 months, which would be a severe penalty;

(b)    maintain the reputation of the profession by publishing this decision with the member’s name;

(c)    provide general deterrence to others in the profession to be careful in all their dealings, including on relatively small jobs;

(d)    provide specific deterrence to the member to be more careful in the future to ensure that his work does not give rise to a complaint; and

(e)    rehabilitate the member, which was demonstrated by his willingness to co-operate with the association in its investigation and with the association’s engineer, the member’s admission of guilt and his willingness to write two difficult exams on his technical knowledge.

The association cited two previous decisions of the Discipline Committee, demonstrating that the proposed penalty in the current matter was within the acceptable range of penalties. The association submitted that the penalty would be fair and appropriate in this matter.

Counsel for the member noted that the matter involved an isolated incident, that it was the member’s first and only complaint, that the member has great remorse, and that he recognizes what he should have done in the circumstances.

PENALTY DECISION

The panel concluded that the proposed penalty is reasonable and in the public interest and accepted the Joint Submission as to Penalty. George Mikhael, P.Eng., co-operated with the association and, by agreeing to the facts and a proposed penalty, has accepted responsibility for his actions and has avoided unnecessary expense to the association.

The panel ordered:

(a)    Pursuant to s. 28(4)(f) of the Professional Engineers Act, George Mikhael, P.Eng., shall be reprimanded orally, and the fact of the reprimand shall be recorded on the register for a period of three (3) months from January 12, 2016;

(b)    The finding and order of the Discipline Committee shall be published in summary form under s. 28(4)(i) of the Professional Engineers Act and include George Mikhael’s name;

(c)    Pursuant to s. 28(4)(d) of the Professional Engineers Act, it shall be a term or condition on George Mikhael’s licence that he shall, within fourteen (14) months from January 12, 2016, successfully complete the following two technical examinations administered by the association: 98 Civ-B1 (Advanced Structural Analysis) and 98-Civ-B2 (Advanced Structural Design);

(d)    Pursuant to s. 28(4)(b) and (k) of the Professional Engineers Act, in the event that George Mikhael, P.Eng., does not successfully complete the two examinations within the time set out in (c) above, his licence shall be suspended for a period of ten (10) months thereafter, or until he successfully completed the examinations, whichever comes first.

George Mikhael, P.Eng., waived his right to appeal and the oral reprimand was delivered following the hearing.

Patrick Quinn, P.Eng., signed the Decision and Reasons on January 19, 2016 on behalf of the discipline panel: Santosh Gupta, P.Eng., Rishi Kumar, P.Eng., Sharon Reid, C.Tech., and Glenn Richardson, P.Eng.